CASE STUDY 1

CASE STUDY 1

This client contracted us to build both their extension and a gable up loft conversion with en-suite bathroom in Wilmington.

The extension is a bright spacious family area complete with kitchen fit and underfloor heating. Also included was a downstairs toilet and small utility room.

The loft conversion included a new roof in synthetic slate to give the property a modern look, it has a master bedroom with Velux window and French doors with glass balustrade.

Time to build: 9 weeks

What did our client think?

The team were all so nice and communicated with us consistently to ensure they made sure we got exactly what we envisioned whilst still advising us on different options which often ended up to be better results! I highly recommend Johnny and his team.